Engaged by Fulton Hogan, we continue our relationship with RAAF Townsville upgrading their existing AGL system. This is a major...
October, 2025
Avionics have Joint Ventured this Project with ADB Safegate. Avionics will complete all major AGL infrastructure and on pavement AGL installation. The project...
October, 2025
Avionics engaged by Downer to complete an important overlay upgrade at Mackay Airport. The project includes the removal of existing...
October, 2025
Avionics were engaged by Downer to complete 3 High Mast Lighting positions complete with ewo LED lighting in mid 2025. ...
October, 2025
Engaged in March 2024 by Fulton Hogan, Avionics were preferred to complete all the AGL Infrastructure and on pavement cannister...
April, 2025
The Department of Defence (DoD) National Airfield Works Program is a 10-year rolling Airfield Capital Works maintenance program which encompasses...
December, 2024
Taxilane DOM2 and Taxilane DOM 3 are critical pavements servicing many of the Domestic Terminal aircraft parking aprons. These pavements...
August, 2024
The scope of this project includes all works associated with the temporary removal and reinstallation, of the existing AGL as...
June, 2024
The existing runway and taxiway surfaces have been servicing Adelaide Airport since 2010/2011 and are now due for maintenance to...
May, 2024