P00012 RAAF Base Townsville AIR 7000 2B MPAR Sep 2025
Engaged by Fulton Hogan, we continue our relationship with RAAF Townsville upgrading their existing AGL system. This is a major...
Project includes the supply and installation of FAA L868 multi-section cannisters and conduit system to areas of the main 16R runway and associated taxiways that has not yet been upgraded, in lieu of new asphalt pavement being completed by Downer. The project is a major infrastructure upgrade for Sydney Airport,...
The scope of this project includes all works associated with the replacement and installation of new taxiway lighting on Taxiways A and C and Installation of new cabling systems within a new/extended pit and duct system. The location of the works will commence in June, 2023 and is located at...
Avionics engaged by Downer to complete an important overlay upgrade at Mackay Airport. The project includes the removal of existing in pavement ground lighting and replacement with new. There was also significant AGL infrastructure required to facilitate new edge lighting.
Avionics have Joint Ventured this Project with ADB Safegate. Avionics will complete all major AGL infrastructure and on pavement AGL installation. The project is scheduled to commence early in 2026 and be completed approx. 2 years later. With major projects occurring simultaneously in Australia, Avionics saw this JV as a good way to reduce risk...
Engaged by Fulton Hogan, we continue our relationship with RAAF Townsville upgrading their existing AGL system. This is a major works project scheduled to be completed over a period of 2 years. The scope of this project includes all works associated with the installation, extension and augmentation of AGL as...
Engaged by Fulton Hogan, we continue our relationship with RAAF Townsville upgrading their existing AGL system. This is a major...
Avionics have Joint Ventured this Project with ADB Safegate. Avionics will complete all major AGL infrastructure and on pavement AGL installation. The project...
Avionics engaged by Downer to complete an important overlay upgrade at Mackay Airport. The project includes the removal of existing...
Avionics were engaged by Downer to complete 3 High Mast Lighting positions complete with ewo LED lighting in mid 2025. ...
Engaged in March 2024 by Fulton Hogan, Avionics were preferred to complete all the AGL Infrastructure and on pavement cannister...
The Department of Defence (DoD) National Airfield Works Program is a 10-year rolling Airfield Capital Works maintenance program which encompasses...
Taxilane DOM2 and Taxilane DOM 3 are critical pavements servicing many of the Domestic Terminal aircraft parking aprons. These pavements...
The scope of this project includes all works associated with the temporary removal and reinstallation, of the existing AGL as...
The existing runway and taxiway surfaces have been servicing Adelaide Airport since 2010/2011 and are now due for maintenance to...
- Project awarded 24th August 2023- Project was completed April 2024 This project involves the re-asphalting of multiple taxiways within...
Avionics supply a wide range of Quality Aeronautical Ground Lighting Components from reputable high end companies including: